Demolition started at LC3 at the end of December 2012. Below are some photos of the building taken the first week in January 2013.
Here is the front of the building along Agoura Road. The Spanish tile roof is removed and the roof coverings at the corners have been removed. Before the rains, the crew was able to waterproof the roof.
A large portion of the lobby area has been barricaded for safety purposes, and the windows to the atrium have been removed to make way for the new sliding glass doors.
The lobby floors after the slate has been removed, ready for polishing and sealing.
The lobby staircase before it is removed and replaced with a new steel staircase.
The two atrium areas with concrete and tile broken up by jackhammers.